| Structure : |
RCC |
| Walls : |
Solid cement blocks / table brick with two coat sponge finish |
| Flooring : |
Marble (slabs) flooring with tin oxide polish
Ceramic in kitchen / bathrooms / utility areas
Corridors / Staircase Marble flooring |
| Windows : |
Powder coated aluminium with mosquito mesh and M.S. grills |
| Doors : |
Teak wood frames with flush doors
Main door - Polished skin door |
| Kitchen : |
Kitchen platform with granite slabs. Stainless Steel sinks with drainboard
Granite tiles dado above kitchen platform
Separate drinking water in kitchen
Individual water tank in each kitchen for emergency use |
| Painting : |
Internal finish - Lappum (smooth), External finish - Birla wall putty
Emulsion paint on exterior, OBD on interior walls, Enamel paint on doors
Polished main door |
| Electrical: |
Concealed copper / aluminium wiring
DBs with MCBs and isolators
Modular switches
Concealed telephone and TV points
Cabling done for high speed internet connections
LAN network cabling within each flat |
| Toilets : |
Matching designer ceramic tiles up to door height
Good quality sanitary and CP fittings (Marc-Jaquar or similar)
Bath tub in master bedroom
Provision for washing machine |
| Plumbing |
Good quality PVC pipes
Solar water heater reducing electricity costs
Separate plumbing for flushing |
| Water supply : |
Water recycling plant for gardening and flushing Water supply through filtered and softened bore well water R/O plant to provide pure drinking water |
| Lifts : |
Two automatic lifts |
| Generator : |
Generator back up for lifts, pumps and common areas lighting
Generator back up for each apartment (1.5 KVA) |
| Security : |
24 hours security service
EPABX facility between each flat and security room
Panic buzzer from each flat to security room |
| Fire safety : |
Smoke detectors in each flat,fire fighting equipment for entire Phase II |
| Parking : |
Double cellar - Two parkings per flat |